The bottom has been copper painted and the skid is new on one side. The cabin roofs are new. One of the beams needs replacing and the mast and rigging needs to be put back up. The hatches need to be made. She has no electronics. Has two outboards, yamaha is new and both are 9.9 hp
Rogerio Martin
she is in water? how much work?
Jul 29, 2019
Judy
The bottom has been copper painted and the skid is new on one side. The cabin roofs are new. One of the beams needs replacing and the mast and rigging needs to be put back up. The hatches need to be made. She has no electronics. Has two outboards, yamaha is new and both are 9.9 hp
Jul 29, 2019
Judy
She is in the water moored on a residential mooring
Jul 29, 2019