A Photo & Discussion Forum for Wharram Design Enthusiasts
The main mast is stepped on the new teak pieces, forward of the bolts. Petrol jugs are stored aft of it between the pods. Halyards run from turning blocks on the upper bolt to the belaying pins (see the 2 holes?) between the aft upper edge of the pods.
Tags:
Albums: Spring 2015 restoration of Spirit of Gaia
Location: Messolongi, Greece
Comment
© 2024 Created by Budget Boater. Powered by
You need to be a member of Wharram Builders and Friends to add comments!
Join Wharram Builders and Friends