A Photo & Discussion Forum for Wharram Design Enthusiasts
In this video I start with a little clean up of the workshop. After that I remove some pins from one of the scheer stringers. The sheer stringers are a bit longer then the panels, so I place each side panel on the workmates and cut the sheer stringers to almost the right length. Then I clamp two panels together and draw the locations of the holes, and after that I drill the holes. Towards the end of the video I also draw and drill the holes for the bulkhead stitches.
Tags:
Comment
© 2025 Created by Budget Boater. Powered by
You need to be a member of Wharram Builders and Friends to add comments!
Join Wharram Builders and Friends