A Photo & Discussion Forum for Wharram Design Enthusiasts
On this day I reorganized one of the rooms, applied some epoxy on backbone parts, removed amine blush. Received several new pieces of 9mm Bruynzeel Hechthout and hardboard, stored them in my temperature and humidity controlled room. Did some sanding. Applied a second layer of epoxy on 2 pieces. And the last thing I did was re-checking the lower bulkhead drawings that I made on the lofting floor.
Tags:
Comment
© 2024 Created by Budget Boater. Powered by
You need to be a member of Wharram Builders and Friends to add comments!
Join Wharram Builders and Friends