2018-01-10 Still working on the backbone parts

On this day I reorganized one of the rooms, applied some epoxy on backbone parts, removed amine blush. Received several new pieces of 9mm Bruynzeel Hechthout and hardboard, stored them in my temperature and humidity controlled room. Did some sanding. Applied a second layer of epoxy on 2 pieces. And the last thing I did was re-checking the lower bulkhead drawings that I made on the lofting floor.