Tiki 30 - Gaps for bulkheads 1 and 7? - Wharram Builders and Friends2024-03-28T12:03:44Zhttp://wharrambuilders.ning.com/forum/topics/tiki-30-gaps-for-bulkheads-1-and-7?groupUrl=tiki30&commentId=2195841%3AComment%3A144124&groupId=2195841%3AGroup%3A1015&feed=yes&xn_auth=noIn Sheet 1 (structural detail…tag:wharrambuilders.ning.com,2015-12-23:2195841:Comment:1385842015-12-23T18:50:15.136ZRicardo Aráozhttp://wharrambuilders.ning.com/profile/RicardoAraoz
<p>In Sheet 1 (structural details) the drawings show both bulkheads going all the way down, that would be ok with bkhd 7 (though it would contradict the assembly booklet that shows no gap), but that would mean it would be two (2) timbers between the keel and the stem (as blkhd 1 would be cutting them apart) and there is no mention about it. And what would the 35mmX10mm notch in blkhd1 be doing there? Haven't been able to find a sensible answer.</p>
<p>In Sheet 1 (structural details) the drawings show both bulkheads going all the way down, that would be ok with bkhd 7 (though it would contradict the assembly booklet that shows no gap), but that would mean it would be two (2) timbers between the keel and the stem (as blkhd 1 would be cutting them apart) and there is no mention about it. And what would the 35mmX10mm notch in blkhd1 be doing there? Haven't been able to find a sensible answer.</p>